Know your site will work before you build

Site feasibility, pre-construction and grid planning for power projects

We help developers, landowners, investors and EPCs find out whether a site can be connected, built and energised before construction money is committed, covering the grid connection, layout, buildability, programme and risk.

25+ yearsHands-on HV/LV delivery experience
£10m–£50mProject values delivered
33kVSenior Authorised Person
NESO, NGET, DNOGrid connection interfaces

What we evaluate on a site

A feasibility review answers one question early: can this site be connected, built and energised on the programme and budget you need?

Grid connection and capacity

Connection options and points of connection, DNO applications, transmission interfaces with NESO and NGET, and what the connection offer means for cost and timing.

Grid planning to 33kV

Substation, switchgear, transformer and cabling arrangements up to 33kV, and how the electrical design fits the site and the network.

Site layout and buildability

Where BESS, PV, generators or chargers, substations and access will sit, and whether electrical, mechanical and civil work can be built as drawn.

Design review

Concept designs and specifications checked for compliance, cost-effectiveness and lifecycle requirements before they are locked in.

Pre-construction programme

Realistic programmes in MS Project or Primavera, construction readiness, sequencing and the interfaces between engineering, procurement and site.

Risk through to energisation

Technical risks found and logged early, with a clear route through commissioning, ITP/ITR, switching and energisation planned from day one.

How a feasibility review runs

  1. Brief and data

    Your goals, site boundary, target capacity, programme and any existing grid information or offers.

  2. Site and grid review

    Connection options, network constraints, site constraints, access and electrical layout.

  3. Options and risks

    Workable options compared on buildability, programme and risk, with the issues that could stop the project.

  4. Recommendation

    A clear go, change or stop view, with next steps for grid applications, design and planning.

  5. Into pre-construction

    Support with programme, construction readiness and contractor interfaces once the site is taken forward.

Sites we assess

  • Grid-scale BESS
  • Solar and co-located BESS
  • Data centre standby and prime power
  • EV charging hubs
  • Standby and STOR generation
  • HV substations to 33kV

Reviews are carried out by engineers who have built, commissioned and energised these projects, so the advice reflects what happens on site as well as on paper.

See what we check by site type

Experience behind the advice

  • Grid connection development and LV/HV design review for a national EV rollout of 2,000+ DC charging stations.
  • Grid connection development for an EV charging programme across 90+ UK sites.
  • DNO applications and grid connection agreements for co-located solar and BESS.
  • Transmission and grid-scale BESS projects of £10m–£50m, working with NESO, NGET and network operators.
  • Commissioning of 50MW hybrid solar and battery projects with 33kV substations.
  • Data centre standby, prime power and black start systems, from pre-construction to commissioning.

Site types

Every technology has its own deal-breakers. These are the questions we answer for each kind of site before it moves into design, planning and construction.

Grid-scale BESS

What we check

Export and import capacity, connection offer timing, transformer and 33kV substation arrangement, container layout and spacing, access for delivery and fire service, and the route to hot commissioning.

Solar and co-located BESS

What we check

Shared connection capacity, PV collector and inverter station layout, cable routes across the site, DNO application strategy and how the two technologies are phased and energised.

Data centre standby and prime power

What we check

Generator and gas engine sizing and placement, black start capability, HV/LV resilience, fuel and access, and how works are sequenced on a live site without risking uptime.

EV charging hubs

What we check

Available LV/HV supply, new substation requirements, charger and transformer positions, civils and ducting, and a connection approach that can be repeated across a rollout.

Standby and STOR generation

What we check

11/33kV DNO connection options, generator and switchgear layout, protection, noise and access, and the testing and handover the network operator will require.

HV substations to 33kV

What we check

Point of connection, switchgear and transformer arrangement, earthing and cable routes, interfaces with NESO, NGET or the DNO, and the switching and permits needed to energise.

What you receive

A clear written recommendation to proceed, change or stop, backed by the evidence behind it.

  • Grid connection options with likely constraints and timing
  • Site layout and buildability findings
  • Design review comments against compliance and cost
  • An outline pre-construction programme
  • A risk register covering grid, site, programme and energisation
  • Next steps for grid applications, design and planning

Have a site you’re weighing up?

Tell us about the site and what you want to build. We'll scope a feasibility review covering grid connection, layout, buildability and programme.

Email info@energised-feasibility.co.uk
Working across the UK